Home | Projects

Past Projects

Expert Planning

Spence

Why did they approach Metisplan? Metisplan can differentiate between the…

Read More
Analysis

ASC/Trevi – Riyadh Metro

Why did they approach Metisplan? To provide an analysis of…

Read More
Framework Planning

Highways England – National infrastructure Programme

Why did they approach Metisplan? Metisplan have experience working in…

Read More
Project Management

Dublin Airport – Terminal 2 Mechanical & Electrical Works

What value did Metisplan bring? Our experienced key staff assisted…

Read More
Analysis & Advice

Wakefield Waste Management PFI Project, Pontefract, UK

Why did they approach Metisplan? Metisplan was employed by Decipher…

Read More
Functional Lead

UK Power Networks, London, South East And Eastern Region

Why did they approach Metisplan? Migration and subsequent planning management…

Read More
Full Design Development

Aldgate Tower, London, UK

Why did they approach Metisplan? Aldgate Tower Developments Ltd was…

Read More
4D Planning

Liverpool Lime Street

Liverpool Lime Street is a main terminus station serving the…

Read More

“HG has utilised Metisplan Ltd for tender programmes and progress monitoring services many times in the past few years. We have always found them to be reliable, professional and provide a very high standard of work for our business.”

Nick Campfield from HG Construction Ltd

I’ve worked alongside Matt at Metisplan for a number of years now and have no reservation in recommending them. They’ve always delivered a comprehensive solution and promoted a collaborative and professional work ethic.

Matthew Asher from Airport Project Management Consultants

Metisplan and Decipher have worked together in a collaborative way to develop the strengths of both organisations and to provide an enhanced capability over a large geographical area. I would have no reservations in recommending Metisplan for project planning and schedule forensic analysis.

Paul Gibbons of Decipher Consulting Ltd

Within the rail sector we were able to help Spence differentiate between the important things that needed to be addressed there and then as they would cause a problem in the future, from activities that had sufficient float to be of less consequence.

Spence

We helped introduce additional capacity into Liverpool Lime Street with the delivery of a new platform, thanks to our expert 4D planning expertise

Liverpool Lime Street

We’ve used internationally recognised best practice to complete detailed delay and disruption analysis on complex logistical piling work for Riyadh Metro

Riyadh Metro